ZCP new technology Zero Carbon Power generation system seeking funding $2.5m

David Clark’s criteria for the basic operation of the ZCP.
 
David Clark Group P/L Mobile 0438 747 601
PO box 9 Corinda Qld 4075
Email: sales@davidclarkgroup.com.au
 
Abstract         ZCP Criteria
 
Seeking Funding to build proto-type!!
 
Statement of design and use:
 
Produce Environmentally Electrical Power.
 
What it must be!
 
It must be 100% environmentally friendly!
It must leave no Carbon Foot Print from its production of power!
It must leave a minimum carbon footprint in manufacture!
 
What it must do!
 
Make electricity, and as a bonus generate water if the environment allows!
Electricity from 5kw to 500MW
Water production is dependent on the environment.
 
Basic Terms:
 
 All it has to do is turn a shaft with enough torque and power to turn the main shaft of a power producing generator, and in doing so not to lose electrical production in the system on what components require force applied.
 
The system has to be expandable from 5kw to 500MW and be available to be built in kit form to any combination of power generation and in any terrain in the world.
 
The system must be stand alone and require no “Stockfeed” to continue production.
 
The system must be able to be maintained and service performed in a way that satisfies WPH&S requirements.
 
The system must be designed and built in a way that it uses the minimum amount of components to reduce the manufacturing carbon footprint; this is the rule for all components from suppliers being incorporated in the system.
 
The system is not to be reinventing the wheel but utilising the technology that is available at present and what would be the ideal components, if the desired component is not made, then design it and make it.
 
More information can be made available to genuine investors.

ZCP

 
Syndicate content